KSV Engineering logo
    KSV Engineering

    Engineering Gallery

    Explore our comprehensive collection of technical site content and engineering solutions in action.

    Modern electrical control panel interface with indicators and switches for real-time monitoring and operation of plant systems.

    Control Panel

    Modern electrical control panel interface with indicators and switches for real-time monitoring and operation of plant systems.

    ID: #25View
    Engineered arrangement for Low Voltage (LV) and Medium Voltage (MV) power cable entry, featuring proper sealing and strain relief.

    LV/MV Power Cable Entry Arrangement

    Engineered arrangement for Low Voltage (LV) and Medium Voltage (MV) power cable entry, featuring proper sealing and strain relief.

    ID: #26View
    Loaded cable tray installation verifying capacity and separation compliance for multiple high-amperage power cables.

    Cable Tray Installation with Power Cables

    Loaded cable tray installation verifying capacity and separation compliance for multiple high-amperage power cables.

    ID: #27View
    Reinforced cable tray support structure implementation, specifically designed to handle dynamic loads and spanning distances.

    Cable Tray Support Structure

    Reinforced cable tray support structure implementation, specifically designed to handle dynamic loads and spanning distances.

    ID: #28View
    Copper earthing busbar installation providing a common grounding point for multiple electrical circuits and equipment frames.

    Earthing Busbar Installation

    Copper earthing busbar installation providing a common grounding point for multiple electrical circuits and equipment frames.

    ID: #29View
    Secure structural earthing connection detail ensuring electrical continuity between steel framework and the facility grounding grid.

    Structure Earthing Connection

    Secure structural earthing connection detail ensuring electrical continuity between steel framework and the facility grounding grid.

    ID: #30View
    Overview of the CCCW Pump House layout showing equipment positioning, piping pathways, and maintenance aisle clearances.

    CCCW Pump House Layout

    Overview of the CCCW Pump House layout showing equipment positioning, piping pathways, and maintenance aisle clearances.

    ID: #31View
    Weather-resistant outdoor cable rack supporting structure designed to protect cabling from environmental exposure while maintaining accessibility.

    Outdoor Cable Rack Supporting Structure

    Weather-resistant outdoor cable rack supporting structure designed to protect cabling from environmental exposure while maintaining accessibility.

    ID: #32View
    Raised floor installation work in progress, creating an underfloor plenum for efficient cable management and air conditioning in control rooms.

    Raised Floor Installation Work

    Raised floor installation work in progress, creating an underfloor plenum for efficient cable management and air conditioning in control rooms.

    ID: #33View
    Integrated outdoor filtration and pumping unit installation for industrial water treatment, complete with piping and electrical connections.

    Outdoor Filtration and Pumping Unit

    Integrated outdoor filtration and pumping unit installation for industrial water treatment, complete with piping and electrical connections.

    ID: #34View
    Installation of Earth Pipe 1, a key component of the grounding system designed to dissipate fault currents safely into the ground.

    Earth Pipe 1

    Installation of Earth Pipe 1, a key component of the grounding system designed to dissipate fault currents safely into the ground.

    ID: #35View
    Secondary earth pipe installation adding redundancy and lowering the overall resistance of the earthing system for enhanced safety.

    Earth Pipe 2

    Secondary earth pipe installation adding redundancy and lowering the overall resistance of the earthing system for enhanced safety.

    ID: #36View